Hala Villa – Dibba
Built 2015–2016 · Delivered 2016
A private two-storey villa in Hala, Dibba Al Fujairah, built by Al Rashidiyah General Contracting between 2015 and 2016 and handed over in 2016. The villa features a natural stone façade with traditional arched windows, a carved arched boundary wall and decorative wrought-iron gates.
Client K. Villa – Al Hala
Client: K. · Al Hala, Dibba Al Fujairah
Built 2016–2019 · Delivered 2019
A private G+1 residential villa with boundary wall in Al Hala, Dibba Al Fujairah, built by Al Rashidiyah General Contracting for Client K.. Construction ran from 2016 to 2019, as the design was extensively modified at the client's request during each phase – our team adapted the works at every stage until handover in 2019.
Construction Progress
Foundations & Ground Beams
Tie Beam / Footing
Columns
Arched Façade & Slab Formwork
Ground Floor Slab
Boundary Wall
Completed Villa – Street View
Open in Google MapsClient A.O. Villa – Al Nahda
Client: A.O. · Al Nahda, Dibba Al Fujairah
Built 2017–2019 · Delivered 2019
A two-storey (G+1) private villa in Al Nahda, Dibba Al Fujairah, built by Al Rashidiyah General Contracting for Client A.O.. Construction started in 2017 and the villa was handed over in 2019.
Construction Progress
Excavation & PCC Preparation
Footings
Footing Concreting & Cube Tests
Tie Beams
Neck Columns & Waterproofing
Backfilling
Anti-Termite Treatment
Columns & Ground Floor Slab Concreting
Project Location – Street View
Tip: zoom in on the Street View to see the villa.
Open in Google MapsClient S.M. Villa – Al Nahda
Client: S.M. · Al Nahda, Dibba Al Fujairah
Built 2016–2018 · Delivered 2018
A single-storey private villa with boundary wall in Al Nahda, Dibba Al Fujairah, built by Al Rashidiyah General Contracting for Client S.M. between 2016 and 2018.
Client O.K. Villa – Seeh Dibba
Client: O.K. · Seeh Dibba, Dibba Al Fujairah
Built 2018–2020 · Delivered 2020
A two-storey (G+1) private villa in Seeh, Dibba, built by Al Rashidiyah Contracting from foundations to finishing between 2018 and 2020 and handed over to the client in 2020.

Construction Progress
Excavation & PCC




Footings & Columns


Foundation Waterproofing & Backfilling


Slab Reinforcement